Articles written by Stephanie Harsha


Sorted by date  Results 1 - 4 of 4

  • I-80 work west of Green River will force interchange closures

    Stephanie Harsha, WYDOT District 3 PR Specialist|May 29, 2025

    The Wyoming Department of Transportation and contract crews from Acme Concrete Paving, Inc. will start concrete pavement repairs on Interstate 80 between mileposts 83 and 86 on Thursday, May 29. Drivers can expect to see single lane closures and decreased speeds as work is occurring. The lane closures will be intermittent and may vary on a daily basis. Beginning Saturday May 31, the eastbound off-ramp at Exit 85 at the Covered Wagon Interchange and the connector road between I-80 and Wyoming...

  • WYDOT starts construction on I-80 west of Green River

    Stephanie Harsha, WYDOT District 3 Public Relations Specialist|Apr 11, 2024

    The Wyoming Department of Transportation, along with contract crews from Kilgore Companies, LLC, doing business as Lewis & Lewis, Inc. will be conducting work on Interstate 80 west of Green River near the Sweetwater County line. Crews will be working on the shoulder at various locations in the eastbound and westbound lanes. Work began Monday, April 1. On April 15, work will begin in the westbound lanes. Drivers will see traffic shifted to a single lane while crews prepare for the milling and...

  • Black's Fork bridge work will cause delays

    Stephanie Harsha, Wyoming Department of Transportation|Aug 4, 2022

    The Wyoming Department of Transportation and contract crews from DeBernardi Construction Company, Inc., began working on the Black’s Fork bridge on WYO 530 at mile marker 14.66 south of Green River on August 1. During the work, traffic will be reduced to a single, alternating lane controlled by a temporary signal. Drivers are advised to be aware of traffic control devices, reduced speeds and expect delays of up to 15 minutes under stop conditions. The bridge will also be under a width restriction of 14 feet. Those traveling with large c...

  • Wolves come up short in down to the wire, nail-biting game

    Stephanie Harsha, Guest Writer|Oct 14, 2015

    A Green River Wolves last-minute touchdown wasn't enough to take down the Star Valley Braves top-ranked offense Friday night. After a hard fought barn burner of a night, the Star Valley Braves edged out the Wolves with a last-minute drive resulting in a game-winning field goal. "Going into the game, we were trying to achieve a victory. It doesn't matter if we are playing an 0-5 or a 5-0 team, our goal is to win. We practiced very well all week and expected to compete well with the top-ranked...